Project in progress

Glass City River Wall

A planned solar, battery-storage, and efficient-lighting system designed to illuminate Toledo's Glass City River Wall after dark while supporting education and responsible long-term operation.

PreconstructionToledo, OhioPreconstruction · July 2026
Organization
Glass City Energy
System
Approximately 200 kW solar, battery storage, and LED illumination
Current status
Engineering revision and preconstruction coordination were underway as of July 9, 2026. Final solar and storage capacities remain subject to approved construction documents.
≈200kW

Planned solar capacity

277,070kWh

Modeled annual solar generation

304t

Modeled annual GHG reduction

170Ksq ft

Mural surface

The challenge

The mural is a prominent daytime landmark but currently disappears after sunset.

Illuminating a large working riverfront site requires far more than fixtures. The project must coordinate lighting, renewable generation, battery storage, land access, civil work, utility requirements, controls, and environmental considerations.

The approach

Elevated Energy is coordinating an approximately 200 kW ground-mounted solar system, battery storage, controllable high-efficiency lighting, and a planned public energy dashboard.

The work involves civic, industrial, engineering, and education partners and remains subject to final approved construction documents.

Return on Mission

Once completed, the project is intended to extend the River Wall's visibility after dark while demonstrating locally connected clean-energy technology.

Generation, savings, and emissions figures remain modeled projections until commissioning.

Public art powered with purpose

The project connects public art with renewable energy, efficient lighting, education, tourism, and local industry.

Lighting controls are being designed to allow responsible operating schedules, including dimming or shutdown during sensitive migratory-bird periods.

A planned public dashboard will allow students and visitors to explore how the project produces, stores, and uses energy.

Current status

As of July 9, 2026, project drawings were being revised around the selected battery and inverter configuration.

LED equipment had been purchased, with City review and final civil and electrical coordination still ahead.

Final capacities and operating performance will be published after approved construction documents and commissioning are available.